Environmental Test
Reports
TEST REPORT ON
FOUR (4) POWER SUPPLIES
P/N:
NB50DM/12/15, S/N: 467066,
P/N: CB30SM/2, S/N: 468546,
P/N: CB5SM/5, S/N:489095, AND
NB150SM/5, S/N: PROTO #3
FOR
MARTEK POWER ABBOTT
TEST
REPORT NO.
R25983A
Jan 16,
2004
Prepared by:
GARWOOD
LABORATORIES, INC.
7829 Industry Avenue
Pico Rivera, CA 90660
Tel: 562-949-2727 |
| Prepared by: |
R.M. "Rick"
Clemens,
Technical Writer |
Date: 1/16/04 |
| Approved by: |
William
Flower,
Quality Assurance Manager |
Date: 1/16/04 |
| Approved by: |
Vic Vergilio,
Laboratory Manager |
Date: 1/16/04 |
| |
|
|
|
|
|
| 1.0 |
PURPOSE |
|
1.1 |
|
The purpose of this test report is to present procedures employed and the results obtained
while conducting the Environmental Tests of Vibration, Humidity,
Temperature/ Humidity/ Altitude, Acceleration, Temperature Shock, and
High Impact Shock, four (4) Power Supplies, P/N: NW50DM/12/15, S/n:
467066, P/N: CB30SM/2, S/n: 468546, P/N: CB5SM/5, S/N: 489095, and P/N:
NB150SM/5, S/N: Proto #3, submitted by Martek Power. |
|
1.2 |
|
The Environmental Tests as described in
this report were performed in accordance with the references in Para.
2.0 of this report. |
|

|
| 2.0 |
REFERENCES |
|
 |
| 2.1 |
|
5739 |
Martek Power Purchase Order |
|
2.2 |
|
S.O.W. |
Martek Power Statement of Work, Environmental Tests |
| 2.3 |
|
MIL-STD-810F |
Department of Defense Test Method Standard for Environmental Engineering
Considerations and laboratory Tests |
|
2.4 |
|
ISO 10012-1 |
Quality Assurance Requirements for Measuring Equipment |
| 2.3 |
|
ANSI/NCSL Z540-1-1994 |
Calibration Laboratories and Measuring and Test Equipment General
Requirements |
|
|
| 3.0 |
SUMMARY |
|
3.1 |
|
The four (4) Power Supplies, P/N:
NW50DM/12/15, S/n: 467066, P/N: CB30SM/2, S/n: 468546, P/N: CB5SM/5,
S/N: 489095, and P/N: NB150SM/5, S/N: Proto #3, were subjected to and
completed the specified Environmental Test of Vibration, with no visible
evidence of damage or deterioration noted due to testing |
|
3.2 |
|
The four (4) Power Supplies were
considered to have met the requirements of the specified Environmental
Test as conducted by Garwood Laboratories, Inc, with conditions as noted
in this report. |
|
3.3 |
|
The four (4) Power Supplies were returned
to Martek Power for further evaluation after the completion of testing |
|
|
|
| Please
send site comments / suggestions to our Webmaster
Martek Power Abbott, Inc.
1111 Knox Street
Torrance, CA 90502, USA
Tel: (310) 202-8820 Fax: (310) 836-4926
© 2007 Martek Power Abbott, Inc. All Rights
Reserved.
This page last updated on
March 19, 2008 07:00 PM. |